I also asked about wells and he said definately have it pounded. He said the casing goes everywhere there is not rock. So if the rock is the bottom 50 feet then the casing will only be on the top 20 feet. (you know I'm putting out vibes to hit pure, perfect water with required output at 70 feet). He said the builder or the well guy could dig the trench hole for the water pipe to the house. I didn't know that the pump is small and fits inside the well casing pipe. His is submersed at the bottom of the well.
We talked about the width of the driveway to get the backhoe and well truck into the woods. Anyone he knew to stay away from? He said no. He told me about his septic leech field and the path it all follows, tank and pipes. Also to have drainage pipes around the house foundation and have them drain off at two corners.
No comments:
Post a Comment