Barry sent the estimate to put the well pump in, disinfect the well, and set up for the water test. About 2 grand. It includes a two day rental, if nec., on his generator, plus fuel, and a labor estimate based on an hourly wage. There is no pre-determined amount of hours that it will take to disinfect the well, which includes pumping out all the water and waiting while it refills.
I keep wondering if I should get a generator or have construction power set up via power pole and meter for the construction, otherwise Sammy will be bringing his generator, too.
Friday, March 13, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment