The retaining walls will be made later on, so this front corner steep grade won't be the finished grade for the corner. It will be a gradual slope.
I am so blessed that the ground was all shale. I got to use what was dug out of the hole for the backfill.
The white material is a fabric used to cover the top of the footing drains.
No comments:
Post a Comment