I am ready to have the well digger come out - now that the septic field placement has been solidified - so I asked June to come out again to dowse some more. She dowsed around two more prospective building sites. I like the knoll the best, now, but I wanted her to 'feel' around in the pines also. This is the water vein she found up on the knoll. Two veins together, one over the other. One is about 100 feet and the other 300 feet down. She said it actually had the strongest pull of the three areas of veins she has uncovered so far.
I marked it with two stakes with red flags and the white bucket, way back (which I switched out with some rocks).
No comments:
Post a Comment