The daylight end of the footing drains is seen here at the bottom of the frame. It is a black corrugated perforated pipe. The open end here is facing downhill toward my intermittent stream.
Me with Rory
Thursday, August 16, 2012
Wednesday, August 15, 2012
Tuesday, August 14, 2012
Septic Tank
I arrived just after the septic tank was set in the ground. If only I hadn't taken the long way to the site I could have seen it lowering in the ground. It is a 1,000 gallon tank as per the County Health Department.
It all went well.
Wednesday, August 8, 2012
Backfilled foundation hole
The retaining walls will be made later on, so this front corner steep grade won't be the finished grade for the corner. It will be a gradual slope.
I am so blessed that the ground was all shale. I got to use what was dug out of the hole for the backfill.
The white material is a fabric used to cover the top of the footing drains.
Tuesday, August 7, 2012
Hole for the water line
You have to use your head and not listen to the excavator (who is doing a great job BTW) when he says the hole for the water line should be right on top of the footing.
A couple of weeks ago, I stood with the excavator facing the basement wall while discussing the next steps. I tried to clear my head on what I thought was a mistake.
I asked, "isn't the 4" concrete floor going to fill in the water line hole when it is poured?"
I think the color washed out of the excavator's face.
Ugh!
My well guy said the concrete guy should have caught the problem when he was told to put the sleeve in there in the first place before he even set the forms.
Now what?
Would you drill a hole 4" above this one?
Would you add an elbow pipe?
Or what?
Saturday, August 4, 2012
Backfill
Had a backfill inspection a few weeks ago and then a second one a week or so later. The walls went up before the 4th of July and was tarred by the 4th.
Backfill is complete and we have been onto the next challenges.
A lot got accomplished last week and now I have a few days off.
I should be talking to the concrete guy about coming back out to pour the floor, or I should be working on my estimates, or picking out rocks from a huge pile, but I think I am going to go for a drive instead.
The Adirondacks are calling me.
Backfill is complete and we have been onto the next challenges.
A lot got accomplished last week and now I have a few days off.
I should be talking to the concrete guy about coming back out to pour the floor, or I should be working on my estimates, or picking out rocks from a huge pile, but I think I am going to go for a drive instead.
The Adirondacks are calling me.